Demolition Projects

PDI has been involved in some of the most challenging and high-profile demolition projects in North America. From the demolition of the lookout deck at the CN Tower and Terminal 1 at Pearson International Airport in Toronto to decommissioning the Victor Mine and preserving the iconic exterior of Maple Leaf Gardens, PDI is entrusted with the most demanding, complex and delicate of demolition projects. No project is too big or too small, we take great pride in all our work. Check out some of the projects that we’re proud of.

IMAGE01

All Projects

Humber Hospital Award
CN Tower observation deck demolition project
This project was a complete demo and salvage, of 3 office/laboratory buildings located on a former P&G campus.
Digester roof removal
The Trent Dam was a 132m long 14 slice dam on the Trent River. The dam was entirely made up of concrete.
The 700 Bay Street project occupied an entire downtown Toronto city block next to a residential tower and a large regional children’s hospital.
880 Bay St 2
At Eden Valley WTP, a fire broke out that caused damage to the water treatment plant.
don-jail-lightbox-8-2x
maple_11
The 700ft Tansley Bridge was no small feat, with 3-truss girders, 4 spans at 48ft wide.
Ashcake Rd was a rapid bridge demolition project that was completed in only 4 shifts.
PDI was contracted in 2017 to remove the Morningside Bridge in 2 phases. The bridge was six spans (4 spans of 100’, and 2 spans of 85’) and averages 100’ above the ground and river below.
port bruce1
Image of Hurdman Bridge with water below.
Goderich-thumb

All Projects

Humber Hospital Award
CN Tower observation deck demolition project
This project was a complete demo and salvage, of 3 office/laboratory buildings located on a former P&G campus.
Digester roof removal
The Trent Dam was a 132m long 14 slice dam on the Trent River. The dam was entirely made up of concrete.
The 700 Bay Street project occupied an entire downtown Toronto city block next to a residential tower and a large regional children’s hospital.
880 Bay St 2
At Eden Valley WTP, a fire broke out that caused damage to the water treatment plant.
don-jail-lightbox-8-2x
maple_11
The 700ft Tansley Bridge was no small feat, with 3-truss girders, 4 spans at 48ft wide.
Ashcake Rd was a rapid bridge demolition project that was completed in only 4 shifts.
PDI was contracted in 2017 to remove the Morningside Bridge in 2 phases. The bridge was six spans (4 spans of 100’, and 2 spans of 85’) and averages 100’ above the ground and river below.
port bruce1
Image of Hurdman Bridge with water below.
Goderich-thumb
"Demolition is always complex and challenging, but we have the in-house expertise to bring new and innovative solutions that increase safety, efficiency while saving our clients both time and dollars."
- Brian Priestly, Chief Operating Officer

Our team has grown to over 500 employees, delivering demolition services across OntarioAlbertaBritish ColumbiaOhioKentucky, and Tennessee.