P&G BUILDING

This project was a complete demo and salvage, of 3 office/laboratory buildings located on a former P&G campus. In total the 3 buildings were originally 450,000 sq ft. The PDI | GCD team split one of the buildings in half in order to retrieve electrical components for the client. Prep work included the high reach and 470 excavator working together to demolish the area, while a 2nd crew worked on the inside preparing for removal. Once the building was prepped, it was time to move in the crane. Work continued on the East side of the site until the crane pick was complete. Safety was our top priority throughout the project.

PG Building

PROJECT HIGHLIGHTS

This project was valued at $4,500,000

2100cy disposal, 40,000ton concrete, 3900ton ferrous

September 2022

PDI IN ACTION

noun comment 106852

PDI’s in house engineer along with our sub-trade Western Mechanical, focused on a methodology that allowed the bridge to be rolled off of the existing piers to minimize the risk of debris falling in the waterway, and to give easy access to PDI’s equipment at the shoreline for material separation.

RELATED PROJECTS

RETURN TO ALL PROJECTS