AIRSIDE PAVEMENT RESTORATION PROGRAM
At the Toronto Pearson Airport, the PDI team was contracted to remove the existing concrete pavement to allow for new pavement to be constructed. Concrete was broken with a hydraulic hammer mounted to a 50T excavator. A second 50T excavator was used to excavate and load trucks for delivery to our onsite crushing operation and the remaining offsite. Concrete and cement stabilized base was 100% recycled. We crushed 75,000 tonnes to 37.5mm minus material and the remaining was crushed offsite. A third excavator was paired with a dozer to excavate and load the granular and sub grade material for offsite disposal.
PROJECT HIGHLIGHTS
“The Terminal 1 job was the project that was a turning point for us in being able to bid larger projects without being afraid of actually doing them.”