PDI was contracted to demolish 3 buildings. Our engineering team created a step-by-step plan to successfully demolish each of these structures safely. Starting with the smallest of the 3 buildings, PDI’s team used a method called “tripping” to selectively cut the taller structures down so that they fell in a controlled manner and in the proper direction. The materials from this project were sorted, processed, and then loaded onto rail cars and transported to recycling facilities.