CAMPBELL'S SOUP PLANT

PDI’s experience and expertise with rapid demolition meant we had the right manpower and appropriately sized equipment to tackle the demolition of this 30 acre site.

Abatement and environmental remediation were performed simultaneously on all the buildings to clear for demolition. PDI demolished 12 buildings and a 200ft tall chimney within a 10 week period.

The South building, erected in 1931 and 1944, was deemed a historic landmark and required a separation to keep the 2 story façade and adjacent bays in place. To protect the historic elements, PDI built a robust wall to enclose the building. Permanent Steel columns were put in place for support and installed with concrete roof slabs.

Campbells Soup Plant industrial demolition project scaled

PROJECT HIGHLIGHTS

This project was valued at $4.9 Million

Post demolition, PDI successfully recycled 100% of the concrete, brick and rubble, metal and construction generated from the project

This project commenced in January 2021 and was completed in April 2021

PDI IN ACTION

noun comment 106852

As part of our community engagement initiatives, PDI responded and made adjustments to production based on the neighbours’ concerns (with regard to dust) because of the number of excavators onsite (more than 12), and the high
volume of materials being processed every day (about 100 truckloads leaving the site each day).

RELATED PROJECTS

RETURN TO ALL PROJECTS

FEATURED VIDEOS

Watch Priestly Demolition do the unthinkable—and take down the entire Gardiner Expressway Eastbound Ramp in just 5 weekends. This is a fresh new look at the masters of bridge demolition. See drone footage, time-lapse video, and project highlights of this rapid demo from the PDI team, plus a behind the scenes look at how this project plan comes together, and the people who make it happen.

Demolition of the Trafalgar Road and 401 Overpass Bridge

This Rapid Bridge Demolition is different from what you’ve seen before. Watch as PDI crews demolish the structure from both the top and bottom simultaneously. Featuring interviews with our crew.

The Kobelco 1600, A Gamechanger for PDI

This heavily modified, Kobelco 1600, 200T beast will allow us to take down higher buildings than ever before.

Victor Mine, Ontario’s First and Only Open Pit Diamond Mine

Must see demolition of the Victor Mine, where calling in for backup isn't an option. Priestly Demolition flies in additional heavy equipment by Hercules aircrafts, to complete the project in this remote location near James Bay in Northern Ontario.

Underwater Demolition of the Glen Miller Dam 3

Priestly Demolition dives into the murky waters of the Trent Severn Waterway—hammering and removing concrete 16 feet below the surface. This underwater demolition provides a whole new set of challenges, but that's nothing new for PDI and the bigger the challenge, the more excited we get. Watch now to see how it's done.

Must See—New Kind of Demolition for Priestly Demolition

Demolition isn't always about smashing buildings to the ground. See how Priestly Demolition is taking the opposite approach for this project.