SILO DEMOLITION IN NAZARETH, PA

The PDI team was contracted to demolish 28 concrete silos, 80’ in height. PDI used one Liebherr 954 high reach and two 350T excavators to complete the demolition. The 954 high reach helped bring down the silos from 80’ to 20’ which allowed the 350 T excavators to reach the remaining part of the structures. Separation work was also needed due to steel framing within the silos.

Wind Turbine Generator Demolition 1

PROJECT HIGHLIGHTS

This project was valued at $945K.

Recycled Material: 90%

This project took place from June 2022 – November 2022