The bridge construction consisted of one 290 foot by two lane bridge with concrete encased steel truss arches with a concrete deck. The second bridge was a 100 foot long two lane wide poured in place concrete bridge.
Each bridge was demolished using two 50 ton excavators with hammers and barges in the river. The bridges were demolished one after the other. The existing surrounding was restored to a naturally slopped river bank.