The bridge construction consisted of one 290 foot by two lane bridge with concrete encased steel truss arches with a concrete deck. The second bridge was a 100 foot long two lane wide poured in place concrete bridge.

Each bridge was demolished using two 50 ton excavators with hammers and barges in the river. The bridges were demolished one after the other. The existing surrounding was restored to a naturally slopped river bank.

severn2

PROJECT HIGHLIGHTS

This project was valued at $900,000

PDI recycled 5000 metric tonnes of concrete and 1500 metric tonnes of steel from this site

This project commenced in January 2017 and was completed by April 2018