Chemical Plant Demolition
PDI was contracted to demolish 3 buildings. Our engineering team created a step-by-step plan to successfully demolish each of these structures safely.
PDI was contracted to demolish 3 buildings. Our engineering team created a step-by-step plan to successfully demolish each of these structures safely.
The PDI team was contracted to demolish 28 concrete silos, 80’ in height.
Ashcake Rd was a rapid bridge demolition project that was completed in only 4 shifts.
The PDI team faced new challenges having to battle hurricane Nicole during the removal.
At the Toronto Pearson Airport, the PDI team was contracted to remove the existing concrete pavement.
This project was a complete demo and salvage, of 3 office/laboratory buildings located on a former P&G campus.
One of our largest projects yet, with a total of 19 full bridge demolitions and 13 partial removals.
The Bay and Adelaide North Tower project was an engineering and demolition challenge unlike many others.
PDI worked with PCL Construction in Edmonton to demolish the Legislature Annex Building.
This challenging rapid demolition project required exceptional planning and coordination from our entire team.