Priestly Demolition is one of North America's largest demolition contractors.
Stadium and Arena Demolition We have been involved with the Rogers Centre, Scotiabank Arena, Simmons Bank Liberty Stadium, Maple Leaf Gardens and BMO Field. Stadium and arena demolition projects often encounter time critical challenges. Renovation projects need to be scheduled…
How Demolition Contributes to LEED Certification Leadership in Energy and Environmental Design (LEED) is the world’s most widely used and recognized certification system for sustainable buildings and construction practices. When was LEED First Developed? The U.S. Green Building Council…
The Environmental Benefits of Material Salvage in Demolition The construction and demolition (C&D) industry is at a crossroads where sustainability is no longer just an option but a necessity. Global waste production is constantly escalating at an alarming rate. Priestly…
The YWCA facility in downtown Calgary was a complete structure demolition including abatement.
The scope of work included the installation of protective material to the foundation and anchor bolts, backfilling around the base with pea gravel.
The 700ft Tansley Bridge was no small feat, with 3-truss girders, 4 spans at 48ft wide.
The Grosvenor building project was a complete abatement and demolition of the 10-storey building and 2 storey annex.
Full structural demo of the original Sonoco Products Bleachery.
This project included planning and demolition of the Strathcona Lime Plant.
At Eden Valley WTP, a fire broke out that caused damage to the water treatment plant.