Bridgepoint Health
Sometimes the challenge in demolition is less the thing being demolished and more the protecting of the things that surround it.
Sometimes the challenge in demolition is less the thing being demolished and more the protecting of the things that surround it.
Select demolition was performed in a phase sequenced approach.
PDI’s experience and expertise with rapid demolition meant we had the right manpower and appropriately sized equipment to tackle the demolition of this 30 acre site.
The goal of the demolition project was to safely remove the entire roof in one crane lift without damage
The Trent Dam was a 132m long 14 slice dam on the Trent River. The dam was entirely made up of concrete.